Bonto Office Complex

Office / Retail

Engineering challenges

A project of long, asymmetric cantilevers, in which controlling the cantilevered parts’ deflection, deformation and stability decided the choice of structural system.

Asymmetric 8 m cantilevers

≈ 8 m Cantilever

Long, asymmetric cantilevers of up to about 8 m, one of the main design challenges.

Asymmetric 8 m cantilevers — Bonto Office Complex

Vierendeel frames against the sag

Vierendeel systems control the cantilevers’ deformation, spreading the load path up the height of the structure and adding redundancy to the cantilever system.

Vierendeel frames against the sag — Bonto Office Complex

Bracing for local deflection

Alongside the Vierendeel frames, bracing controls the deflection and local deformation of the cantilevered parts.

Bracing for local deflection — Bonto Office Complex

Torsion and unbalanced stiffness

The asymmetry of the cantilevers makes the structure more sensitive to torsion and to an unbalanced distribution of stiffness; controlling deformation was one of the main design criteria.

Torsion and unbalanced stiffness — Bonto Office Complex

Basements without drop beams

Basement floors designed without drop beams, for more clear height in the parking levels. Basements without drop beams help the architecture and the parking, and bring the structure and the services into closer agreement.

Basements without drop beams — Bonto Office Complex