Sheikh Bahaei Mixed-Use

Mixed use

Engineering challenges

A project of very particular architecture and large spans, whose structural solution was developed to open the spaces up, remove obstructive drop beams and keep the architecture free.

A 26 m span on storey-deep Vierendeel

≈ 26 m Span

Very long spans of up to about 26 m are among the project’s defining challenges; storey-deep Vierendeel action controls them.

A 26 m span on storey-deep Vierendeel — Sheikh Bahaei Mixed-Use

Top-down with the building’s own frame

Here top-down is more than a way of holding the excavation: the building’s own frame works as part of the shoring system while it is built.

Top-down with the building’s own frame — Sheikh Bahaei Mixed-Use

Floors without drop beams

Floors without drop beams improve the architecture and the services and raise the clear height, and called for close control of the deflection and deformation of the beams and the load-transfer systems.

Floors without drop beams — Sheikh Bahaei Mixed-Use

Concrete and composite slabs

Concrete and composite slabs of several kinds, each suited to a part’s geometry and needs, answer both the architectural and the structural requirements.

Concrete and composite slabs — Sheikh Bahaei Mixed-Use

The inner building, moving with the main body

A building in the middle of the main building, whose structural behaviour had to be closely matched with the main body’s.

The inner building, moving with the main body — Sheikh Bahaei Mixed-Use

Services involved

Related articles

Related books

Similar projects