Mimosa Hotel

Mixed use

Engineering challenges

A retail and hotel complex in the north of Namak Abrood, close to the shoreline, where weak ground, long cantilevers and a particular architectural geometry made the design a multidisciplinary problem.

8.5 m cantilevers on Vierendeel frames

≈ 8.5 m Cantilever

Long cantilevers of up to about 8.5 m led to a Vierendeel system controlling the deformation at their ends; its members needed additional seismic checks.

8.5 m cantilevers on Vierendeel frames — Mimosa Hotel

Weak coastal ground: settlement, liquefaction

Close to the shoreline and on weak soil, piles control the settlement and the vertical and differential deformation under the foundation. On the coast, liquefaction as well as settlement became a design question; the foundation had to be a geotechnical and a structural answer at once.

Weak coastal ground: settlement, liquefaction — Mimosa Hotel

Two parts joined again: progressive collapse

The structure’s two separate parts join again in the upper floors; this transfer zone is one of the project’s sensitive points and needs additional checks against progressive collapse.

Two parts joined again: progressive collapse — Mimosa Hotel

Sea wind, serviceability quake, seismic joint

104 m Structural height

The building’s particular geometry called for dynamic wind analysis, non-linear checks of the seismic joint and serviceability-level earthquake checks with a shorter return period.

Sea wind, serviceability quake, seismic joint — Mimosa Hotel